Jet Mill Complete Rebuild
A Customer asked WBA if they could rebuild a Jet Mill which included:
- Sand Blasting
- Painting
- Moving and/or Plugging Feed Pipes
- All New Hardware, Seals, Belts, O Rings, Pistons, Door Switches and Compensators
- Fabricating New Mounting Arms, Stand, and Guard for Belts
- Rebalancing Classifier Wheel
- Refurbishing Bearing Housing & Motor
- Running Mill at 25/50/75/100 Percent for 8 hours
- Building and Wiring Control Enclosure
- Drawing for Control Enclosure
- This is the Jet Mill when entered our shop
- Plasma Cut Tube off the Top Lid of Jet Mill
- Plasma Cut Tube off the Top Lid of Jet Mill
- Welded Cap on the Lid
- Sand Blasted Lid
- Sand Blasted Mid Section
- Sand Blasted Ring
- Painted Lid
- Painted Mid Section
- Painted Ring
- Painted Bottom of Jet Mill
- Fab Square Stand made from 6″ x 6″ Steel Tubing
- Partially Assembled and Painted Jet Mill
- Partially Assembled and Painted Jet Mill with Stand
- Partially Assemble Jet Mill with Covers
- Partially Assemble Jet Mill with Arms
- Jet Mill Belt Guard
- Jet Mill Partial Assembly Ready for Motor Testing
- Jet Mill Complete Assembly with Compensators
- Jet Mill Complete Assembly with Compensators
- Jet Mill Control Enclosure Door with Purge System
- Jet Mill Control Enclosure Door with Purge System
- Jet Mill Controls